How much is the decoration of two bedrooms of 79 s

2022-07-22
  • Detail

Project 1: Foundation Engineering

shovel the wall skin (gypsum ash) 286.40

wall blank base treatment 395.00

wall/ground cement mortar leveling 1417.50

seal the door head 210.00

door pocket base (Blockboard) 147.00

remove the brick wall (120 mm) 238.00

light brick wall (120 mm double-sided plastering) 3003.00

remove the bay window 172.80

remove the insulation layer 680.00

fix the steel mesh before hanging the steel mesh on the back of the cabinet and tiling, and apply mortar 600.00

item 2: waterway Circuit engineering

strong and weak current construction (lump sum price) 6032.00

waterway construction (lump sum price) 1550.00

change down pipe 370.00

change down pipe 283.50

balcony water outflow 300.00

Project III: guest restaurant and aisle

latex paint base treatment (putty) 1840.00

latex paint 736.00

gypsum board shaped ceiling 1874.50

shoe cabinet (including door and ecological board) 2914.00

gypsum board sealing on the upper part of the cabinet 95.00

item 4: primary bedroom

latex paint base treatment (putty) 886.00

latex paint 354.40

wardrobe cabinet (ecological board) 2448.00

gypsum board sealing on the upper part of the cabinet 94.50

item 5: secondary bedroom

latex paint base treatment (putty) 674.00

latex paint 269.60

item 6: Kitchen

General specification of wall tiles (300 × 450 < size ≤ 300 × 600) 1122.00

common specification of floor tiles (size 300 × 300) 236.50

kitchen waterproof treatment 308.25

kitchen and sanitary package pipes 325.00

doorway stone paving 40.00

item 7: bathroom

wall tile general specification (300 × 450 < size ≤ 300 × 600) 1320.00

common specification of floor tiles (size 300 × 300) 253.00

toilet backfilling and surface leveling 196.00

toilet waterproof treatment 315.00

kitchen and sanitary package pipes 325.00

lintel paving 75.00

toilet sewer protection works 200.00

item 8: balcony

emulsion paint base treatment (batch scraping) 156.00

emulsion paint 62.40

General specification of floor tiles (200 × 200 < size ≤ 800 × 800) 429.00

common specification of wall tiles (300 × 450 < size ≤ 300 × 600) 852.50

balcony railing base tiling 136.50

storage cabinet (ecological board) 1248.00

storage cabinet door (ecological board) 429.00

balcony waterproof treatment 396.00

Item 9: miscellaneous

materials upstairs fee 300.00

materials transportation fee 300.00

indoor garbage removal fee 300.00

lamp installation 200.00

sanitary ware installation 150.00

hardware installation 100.00

finished product protection 300.00

ground fixation 300.00

item 10: other charges

999.00

the above quotation is only for your reference, The specific decoration price will be affected by the decoration requirements and other factors. If you have clear decoration requirements for your home, you might as well come to Wuhan home decoration network to tell us your needs. The platform can select 3 to 4 suitable decoration companies to measure the house for free according to your requirements, and formulate a quotation scheme. You can compare them, and some decoration money reduction is waiting for you. See the activity page for details http://whjzw.net/zb/。

郑州精神医院

福州肿瘤医院

北京眼科医院

Copyright © 2011 JIN SHI